Your infrastructure needs to move
Off old servers, to a new provider, or onto Kubernetes, without taking production down on the way. I plan the migration in stages, with a way back at every step.
Exlink: Windows/IIS → Linux → Hetzner → a Kubernetes cluster I built, with GitOps through ArgoCD. Case study →